
Design of a gas receiving facility and gas supply network project for a processing plant
INCIMAT developed the design for a gas receiving facility and the associated supply network for an industrial processing plant, defining a safe, efficient solution tailored

Simulation of Smoke Propagation in an Industrial Building
INCIMAT developed a smoke propagation simulation for an industrial building, evaluating the behavior of the hot gases generated during a fire scenario and their impact

Fire Protection System – Hydraulic Network Calculation for an Industrial Distribution Center
INCIMAT performed the hydraulic design calculations for the fire protection system of an industrial distribution center, developing a solution capable of ensuring the flow rate,

Design of a Fire Protection Strategy for a Logistics Facility
INCIMAT developed a comprehensive fire protection strategy for a logistics facility, defining the measures necessary to ensure the safety of people, the protection of property,

Design of a 500 kWp Photovoltaic System for Industrial Self-Consumption
INCIMAT developed the design for a 500 kWp industrial self-consumption photovoltaic system, aimed at reducing energy consumption from the grid and improving the economic and

Energy Efficiency Improvement Plan for an Existing Commercial Building
INCIMAT developed an energy efficiency plan for an existing commercial building, with the goal of reducing energy consumption, optimizing the operation of the facilities, and